Baraka Patenga Power Limited (BPPL) was incorporated as Private Limited Company on June 07, 2011 of which 51% equity investment holds by Baraka Power Limited and converted as Public Limited Company on April 28, 2014.In line with the success story of Baraka Power Limited, the group of Resident and Non Resident Bangladeshi (NRB) entrepreneurs have developed BPPL to implement 50 MW HFO fired IPP power plant at Patenga, Chittagong, awarded by Bangladesh power Development Board (BPDB)...
Read More
Baraka Patenga Power Limited (BPPL) was incorporated as Private Limited Company on June 07, 2011 of which 51% equity investment holds by Baraka Power Limited and converted as Public Limited Company on April 28, 2014.
In line with the success story of Baraka Power Limited, the group of Resident and Non Resident Bangladeshi (NRB) entrepreneurs have developed BPPL to implement 50 MW HFO fired IPP power plant at Patenga, Chittagong, awarded by Bangladesh power Development Board (BPDB) through tendering process. On July 31, 2011, BPPL signed the Power Purchase Agreement (PPA) with BPDB and Implementation Agreement with MPEMR to generate and supply 50 MW of electricity on Build, Own & Operate (BOO) basis for a term of 15 years. The principal activity of the Company is to set up power plants for generation and supply of electricity. The plant having capacity of 50 MW located at Patenga, Chittagong started its commercial operation on May 04, 2014.
The Plant has been operating by using 08 nos. of brand new Rolls Royce Engine having capacity of 6.984 MW each with total capacity of the plant is 55.872 MW since 2014. In addition, a cogeneration secondary power plant with capacity of 3.20 MW has been operating successfully throughout the year. The STG plant runs by heat recovery from 08 nos. of Rolls Royce gensets exhaust gas without burning any fuel and reduces the fuel cost by 6.40 % annually. For the first time in power sector, a Desulfurization plant has been introduced to the project to reduce sulfur emission at an acceptable low level.
Baraka Patenga Power Limited (BPPL) was incorporated as Private Limited Company on June 07, 2011 of which 51% equity investment holds by Baraka Power Limited and converted as Public Limited Company on April 28, 2014.In line with the success story of Baraka Power Limited, the group of Resident and Non Resident Bangladeshi (NRB) entrepreneurs have developed BPPL to implement 50 MW HFO fired IPP power plant at Patenga, Chittagong, awarded by Bangladesh power Development Board (BPDB)...